October 20, 2012 All Flooring Solutions

Quality Engineered Hardwood Floor Installation Instructions

Before You install engineered hardwood flooring

Sub-Floor Preparation to install Engineered Hardwood Flooring:
• The sub-floor must be completely dry. A new concrete slab will usually take 90 to 150 days to dry thoroughly
depending on size of slab and weather conditions. The moisture content difference should be no more than 4%
between the engineered wood floor and concrete sub floor.
• If plywood is used as a sub-floor, the moisture content difference should be no more than 4% between
engineered wood floor and plywood sub floor. Plywood size for sub-floor is suggested to be ¾” x 48” x 48” and
leave ¼” between sheets for expansion.
• The sub floor must be free from any type of paint, oil, greases, dust and all other types of residues.
• The sub floor should be level. The level drop must be no more than ¼” over a 10 feet distance.
Glue-down installation guidelines for QUALITY ENGINEERED Hardwood Floors:
(Recommended method of Installation for both concrete and plywood sub floor)
• We recommend an acclimation period of 3 days for all our engineered hardwood flooring products.
• Test Sub-Floor before every installation. (Please follow Sub-Floor Preparation instruction listed above).
• Bostik Pro-Cure is recommended.
• A Urethane based adhesive should be used exclusively. Bostik’s Best glue is recommended.
• Read the glue manufacturer’s instructions, which is always printed in details on the glue container to choose the
correct size trowel.
• Create a working line parallel to the starting wall, in multiples of our engineered plank width, to set up the
baseline of installation.
• Following the spread rate, curing time, spread the glue evenly on the sub-floor to cover the area the installer can
lay the planks in time for best result of the glue.
• Lay one row of plank along the entire length of work line. Add each additional row of flooring, watching the
pattern repeat and offsetting or staggering the joints at least 6 inches.
• A ½” expansion space should be left around the perimeter.
• Roll whole floor with a 150 lb. Roller within 3-6 hours after installation.
• Finished areas should be covered with a protective paper immediately after installation to prevent damage from
installation process.
Nail-Down installation guidelines for QUALITY ENGINEERED Hardwood Floors:
(ONLY FOR PLYWOOD SUB FLOOR)
• We recommend an acclimation period of 3 days for all our engineered hardwood flooring products.
• A 15 lb. felt paper moisture barrier should be applied to the plywood sub-floor with 6” overlaps before installing
the new wood floor.
• Create a working line to the starting wall, in multiples of our solid plank width.
• Install the first row of wood with the groove side towards the wall using top nails as necessary to hold the first
row firm and in place. Adjust as necessary.
• Use adjustable pneumatic power hammer or nailing machine with 1 ½” – 2” nails as is required and make sure
nailing foot is appropriate to the nails / staples used. To avoid damage to the tongue be sure to adjust for proper
pressure on the compressor.
• Add and adjust each additional row of wood planks, offset or stagger the end joints at least 6” to prevent
repeating the pattern.
• Finished areas should be covered with a protective paper immediately after installation to prevent damage from
installation process.
Floating installation guidelines for QUALITY ENGINEERED Hardwood Floors:
• We recommend an acclimation period of 3 days for all our engineered hardwood flooring products.

, , ,